New Eastern Passenger Entrance at Bristol Temple Meads Station for Network Rail
Working with Crouch Waterfall as part of the design team for BAM, Robinson Kenning & Gallagher are undertaking the Planning, Listed Building and working/construction drawing package for a new Eastern pedestrian access and subway extension scheme at Bristol Temple Meads station, Bristol.
Set within the context of the existing Isambard Kingdom Brunel designed Grade 1 Listed Station the new entrance forms part of a wider strategy to redevelop the ‘Temple Quarter’ as part of a new campus for the University of Bristol. After a delicate planning process, Approval has been granted and all Planning Conditions have been discharged.
BAM are the main contractor delivering these works for Network Rail.